Mundipharma, Aurora Place

Completed: 2016

Project Manager: Schiavello

Architect: Davenport Campbell

Builder: Schiavello

Size: ~1,100m²

As part of a delivery team that included Davenport Campbell and Schiavello Construction we were commissioned by Mundipharma to deliver their new Sydney Headquarters located on level 24 of Aurora Place. The project included a total of 1,100 sqm of floor space and was completed in 2016.

Mundipharma underwent a change in the way they work as part of the project, moving from a static work place to an activity based workspace. As the services engineers our role on this change was to ensure that the services infrastructure supported this change in working. With an upgrade in desk top technology we were able to reduce the use data points to a single point per desk which is utilised for back up to the extensive wireless network provided across the tenancy. The inclusion of several meeting spaces and a training/wellbeing room meant that the mechanical services supplementary systems across the floor exceeded the allowances of the base building infrastructure. Through providing a local control system we were able to manage this issue through understanding the diversity of usage and sharing the capacity across the spaces on an as required basis.