iAccelerate – University of Wollongong

Completed: February 2016

Project Manager: CBRE / UoW

Architect: ADM

Builder: Project NSW

Size: ~5,000m²

Evolved Engineering were engaged by the University of Wollongong to provide mechanical and electrical design and monitor the construction of the new 5,000m² iAccelerate building located on the technology campus. The building incorporates three levels of educational and commercial office ‘clusters’ to foster entrepreneurial enterprises from the Illawarra region.

The project incorporated large areas of air-conditioning, in-slab hydronic and mixed mode ventilation systems controlled via a sophisticated building management and control system.

Ultimate flexibility of the users was provided throughout the lighting, communications and power systems to allow for small to medium enterprises to occupy the various office, meeting, presentation and collaboration spaces throughout the building.

.