Clemenger
Completed: 2019
Project Manager: Spitfire Control
Architect: Bates Smart
Builder: FDC Construction
Size: ~4,200 m²
As part of a delivery team including Spitfire Control, Bates Smart and FDC Construction, Evolved Engineering were engaged to provide the Building Services Design and Construction services for the office relocation and fit out of all services on behalf of Clemenger. The project consisted of 4,200 m² across a total of 3 floors within a heritage Wharf located at Walsh Bay, Sydney.
The heritage nature of the wharf added complexity to the engineering design through both the aesthetic and build-ability of the systems to be installed. Our design needed to be not only technically sound to meet the future needs of Clemenger but also sympathetic to the exposed timber and steel structure of the wharf.
The lighting design in particular was engineered to both highlight and enhance the existing heritage elements of the wharf that make the space standout from a typical commercial office spaces. This was delivered so that the building became the feature and not the light fittings themselves.
.